Skip to main content
Download PDF
- Main
Field Evaluation of San Pablo Corridor Transit Signal Priority (TSP) System
Abstract
This document reports the results of the evaluation of the Transit Signal Priority currently under operation at AC Transit. The paper discusses about the Measure of Effectiveness and a quantitative evaluation method for TSP. It reports the data collected and analysis conducted of the concerned TSP system and presented the evaluation results.
Main Content
For improved accessibility of PDF content, download the file to your device.
Enter the password to open this PDF file:
File name:
-
File size:
-
Title:
-
Author:
-
Subject:
-
Keywords:
-
Creation Date:
-
Modification Date:
-
Creator:
-
PDF Producer:
-
PDF Version:
-
Page Count:
-
Page Size:
-
Fast Web View:
-
Preparing document for printing…
0%